Haiyang NPP Unit 2 Connected to the Grid
Source:Writer:Date:15/10/2018
At 9:51 a.m. on October 13, 2018, Haiyang NPP Unit 2 was successfully connected to the grid for the first time. All technical indicators met the design requirements and the unit was in good status.
Appendixes: