Case Study: Integrated Pollutants Control Project for the Newly-built 660 MW Unit of Hechuan Power Plant
Source: Date: 15.06.23

The integrated pollutants control project for the newly-built 660 MW unit of CPI’s Hechuan Power Plant was built by CPI Yuanda Environmental Protection Engineering Co., Ltd and put into operation in 2014. It was the first project of its kind in China for 660 MW units.

According to a third-party test conducted by Northeast China Electric Power Research Institute, the effect of pollutants control was remarkable, and all technical indicators met the ultra-clean emission requirements, with the outlet emission concentration of SO2, dust and NOx reaching 14.4 mg/m3, 7.99 mg/m3 and 45.5 mg/m3 respectively.

FILE:
RELNEWS:
 
 Production Safety
 Environmental Performance
 Development of Circular Economy
 
 
 
 
 
无标题文档
Add:Building 3,No.28,Financial Street,Xicheng District,Beijing,China
Mail add:P.O.Box 2201,Beijing,China Post code:100033
Tel:+86-10-66298000 Fax:+86-10-66298095
Web Services:China Zhongdian Media Co., Ltd