• Pakistan

    2x660 MW CPHGC Coal-fired Power Plant

    2x660 MW CPHGC Coal-fired Power Plant

    China Power International Holding, a subsidiary of SPIC, is the developer of the 2x660 MW High-efficiency Clean Coal-fired Power Project, and the project was put into commercial operation in August 2019.

    Thar Coalfield Block II Open-pit Mine Project

    Thar Coalfield Block II Open-pit Mine

    SPIC Inner Mongolia Energy owns preferred equity in Pakistan's Thar Coalfield Block II Open-pit Mine Project. In April 2016, Phase I, with an annual production capacity of 3.8 million tons, started construction. In April 2019, infrastructure stripping was completed, allowing for large-scale mining.

    SPIC Shandong Electric Power Engineering Consulting Institute is the EPC contractor for Pakistan's ADB-201 Transmission Line EPC Project (Lot-II/III/IV).